Electrical and Instrumentation Construction

 

  • Seven Year Contract with CABGOC to provide for all in-country Electrical and Instrumentation Construction
  • Project includes 40 Expatriate Technicians from South Africa, India, Philippines, Europe, and the US and 100 Angolan Nationals
  • Awarded in 2004
  • Projects range from two-person well hook-ups to 50 person construction projects installing instrumentation & controls for compressor packages offshore

Control System and Integration

  • Complete Process and Safety Control System for the CABGOC  North Nemba project in Angola
  • Design, project management, manufacturing, management of programming resources, pre-commissioning, and commissioning of this 4,000+ I/O, multi-station host MMI, dual redundant master process panel, dual redundant master safety panel, two multi-well control panels and 19 remote PLC cabinets.
space

ExxonMobil Kizomba A and B Sulfate Removal System

 

Natco and TEST provided the Design and Fabrication of a Water Injection System with Sulfate Removal Membranes for the Kizomba A and B FPSO.

 

The Scope Included:

  • Process design
  • Vessel Design
  • Skid Design and Fabrication
  • Instrumentation Installation
  • Electrical and Pneumatic Skid Installation
  • PLC Based Control System
  • Onsite Commissioning
  • Start-up Assistance

Headquarters
Largo do Pescador No. 7
Ilha de Luanda - Angola
Phone: 244 222 380122
Phone: 244 222 382110

Malongo Office
Cabinda, Angola
c/o CABGOC Malongo Base
Phone: 925 842-1111, ext 3044